![]() The manufacturer was tasked to build the Reed, a bigger, more powerful dredge to meet the challenge of the job. Robert Bleakley Dredge, Dredge Reed was christened in 2010 after the post-Katrina years showed a marked increase in freight and cruise line traffic,as well as greater opportunities for commerce and wharf accessibility. The Port had previously been contracting the dredge work, but discovered the costs had become insurmountable. The Mississippi leaves a natural accumulating deposit of sand and silt on the east side of the river that, if not removed on a regular basis, would make that side of the river inoperable. In order for freight containers and cruise lines to have access to the Port of New Orleans, the Port Authority must maintain reliable depths at each of the wharves.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |